Commercial · Mission critical

Data Centers

Downtime has a price per second. We install and maintain the CRACs, CRAHs, in-row units, and chiller plants that keep colocation, enterprise IT, and edge sites within band — with a level of change control that satisfies your uptime auditor.

Practice lead

Mission critical

1.28

avg PUE delivered

612 MW

cooling under contract

100%

MOP compliance rate

Where facilities like yours get stuck

Four problems we hear on the first walk.

01

Rack density outrunning cooling

10 kW/rack yesterday, 30 kW/rack today, 60 kW/rack in the AI build-out. Legacy perimeter cooling can't follow the load.

02

PUE targets and utility scrutiny

New builds locked into 1.3 PUE contracts. Existing sites trying to claw back from 1.8+ without a full plant replacement.

03

Change control on a live floor

Every valve turn, every damper stroke, every controls change has to be MOP'd, peer-reviewed, and executed inside a maintenance window.

04

Redundancy that actually works when tested

N+1 on paper. Concurrent maintainability at 2 AM. Fault tolerance during an actual power event. The three don't always match.

How we deliver

The playbook, on the record.

  • Hot-aisle / cold-aisle containment engineered to your rack layout
  • In-row + rear-door heat exchangers for high-density pods
  • Free cooling + waterside economizer sequences tuned to your climate zone
  • MOP-driven change control with peer review before every field action
  • Concurrent maintainability audits with full failover testing
  • 24/7 site presence contracts for Tier III and Tier IV facilities

Typical scope

Equipment we install and service.

CRAH + CRAC units (perimeter)In-row cooling + rear-door heat exchangersChilled-water plants with waterside economizationAdiabatic + evaporative coolingLeak detection + humidity monitoringDCIM + BMS integration

Standards + codes

What we design and document to.

  • Uptime Institute Tier standards (I–IV)
  • TIA-942 (data center infrastructure)
  • ASHRAE TC 9.9 thermal guidelines
  • NFPA 75 + 76 (IT equipment)
  • SOC 2 change control alignment
  • Utility PUE reporting programs

FAQ

Questions from mission critical teams.

Ready when you are

Book the service, get the number, or call us right now.