Rochester, MN2024Hospital-grade filtration + humidity control

Cedar Clinic surgical wing

HEPA and UV-C at every air handler; sub-40% RH under load for six operating suites.

Cedar Clinic surgical wing

The challenge

The original scope came in as a straightforward replacement. Once we opened the mechanical rooms and pulled twelve months of BAS data, the picture shifted. What looked like an aging system was actually a design mismatch — the loads had drifted over two decades of tenant fit-outs, and the equipment was fighting the building.

The solution

A phased conversion. New equipment sized to the actual load, not the load stamped on the drawings. Controls rewritten. Sequences of operation rebuilt from scratch. The old system stayed live through six months of installation so tenants never lost service.

The result

First full winter: 41% reduction in energy cost against the prior year, normalized for weather. Peak demand down 32%. Zero occupant complaints for four straight months. And a client who is now on year three of a continuing maintenance contract.

What it cost

Flat-rate project pricing, quoted before work began.

$1.86M
Total investment
Three custom AHUs with HEPA final filtration
$742,000
Desiccant dehumidification and reheat coils
$418,000
UV-C arrays and pressurization controls
$236,000
Duct fabrication, sealing, and cleanroom install
$304,000
Validation, balancing, and ASHRAE 170 certification
$160,000

Includes ASHRAE 170 validation and third-party certification.

Estimated annual savings
$84,000 / yr in reduced reheat
Simple payback
n/a — compliance-driven

Figures reflect this project's scope and conditions. Your building will price differently — get a scoped estimate.